chiark / gitweb /
routesearch: support circular routes
[ypp-sc-tools.db-live.git] / yarrg / web / docs
index 6f754bff46e258472de8c5d413723ab7fa8eb117..c211683717acf735bf05e23e34ba4892a2f16605 100755 (executable)
 
 
 </%doc>
-<html><head><title>Website documentation - YARRG</title>
+<html lang="en"><head><title>Website documentation - YARRG</title>
 </head><body>
 
 <a href="lookup">YARRG</a> -
  Yet Another Revenue Research Gatherer
 |
-<a href="devel">development</a>
-|
 <a href="intro">introduction</a>
 |
 <b>documentation</b>
+|
+<a href="devel">development</a>
 
 <h1>Looking up data in YARRG</h1>
 
@@ -119,8 +119,9 @@ like:
 <dd>The capacity of a war brig minus 1%
 <dt>13t 20kl
 <dd>13 tonnes (13,000kg), 20 kilolitres (20,000l)
-<dt>sloop - 100l 100kg
-<dd>The capacity of a sloop minus 100l, minus 100kg
+<dt>sloop - 10 small 40 rum
+<dd>The capacity of a sloop which remains after
+    10 small shot and 40 rum are loaded
 <dt>2t plus 500kg minus 200kg
 <dd>2300kg, with no limit on volume
 </dl>
@@ -128,16 +129,20 @@ Evaluation is strictly from left to right.
 
 <p>
 
-Formally, the capacity is a list of terms, all but the first preceded
-by one of <kbd>-</kbd>, <kbd>minus</kbd>, <kbd>+</kbd>,
-<kbd>plus</kbd>.  Each term may specify a mass and/or a volume
-(separated by a space), as a number followed (without an intervening
-space) by a unit (<kbd>t</kbd>, <kbd>kg</kbd>, <kbd>kl</kbd> or
-<kbd>l</kbd>).  Alternatively each term except the first may specify a
-percentage, which is applied as a percentage change to the answer from
-all the preceding terms.  The first term may be a ship name or
-abbrevation instead.  If the first term specifies only one of mass or
-volume, all the subsequent terms may only adjust that same value.
+More formally:
+<pre>
+ capacity-string := [ first-term term* ]
+ term := ('+' | '-' | 'plus' | 'minus') (value+ | number'%')
+ value := mass | volume
+        | integer commodity-name-or-abbreviation
+ mass := number ('t' | 'kg')
+ volume := number ('kl' | 'l')
+ first-term := mass | volume | mass volume | volume mass
+             | ship-name-or-abbreviation
+</pre>
+
+If the first term specifies only one of mass or volume, all the
+subsequent terms may only adjust that same value.
 
 <h3><a name="losses">Expected losses</a></h3>
 
@@ -169,14 +174,32 @@ possible to do both.
 
 <p>
 
-As a guide: you may expect to lose between 0.1% and 1% per league.
-0.1% would correspond, for example, to losing one fight to brigands
-every ten 10-league voyages.
+As a guide: you may expect to lose between 0.01% and 1% per league.
+For example 0.1% would correspond to losing one fight to brigands (who
+take 10% if they win) for every 100 leagues sailed.
 
 <p>
 
 You can enter the value in the box either as a percentage, or as a
-fraction 1/<em>divisor</em>, eg 1/200 is the same as 0.5%; in each
+fraction 1/<em>divisor</em>, eg 1/2000 is the same as 0.05%; in each
 case it is taken as the loss for each league of the voyage.
 
+<h3><a name="capital">Available capital</a></h3>
+
+If you don't specify the amount of capital you have available to
+invest in the voyage, the trading plan will assume that your capital
+is unlimited.  If you specify an amount in PoE here, the trading plan
+will never require you to spend more than that amount on commodities.
+
+<p>
+
+The trading plan does not take into account accumulated profits from
+each leg of the journey when applying the available capital
+constraint.  For example, if you specify a journey from A to B to C
+and a capital limit of 10000 PoE, the trading plan will not tell you
+to buy 1000 peas at A for 10 PoE each, sail them to B and sell all of
+them for 20 PoE each, and then buy 2000 beans at B for 10 PoE each and
+sail them to C to sell for 20 PoE each even if such a trade would in
+fact be possible.  In practice this is unlikely to be a problem!
+
 <& footer &>